Executive summary – the numbers
| Simple (< 100 GB) | Medium (100 GB – 1 TB) | Complex / Enterprise | |
|---|---|---|---|
| Timeline | 4-8 weeks | 8-14 weeks | 14 weeks – 12 months |
| Project cost | €23K – €46K | €58K – €116K | €116K – €700K |
| After MAP funding | €7K – €14K | €17K – €35K | €35K – €210K |
| Annual Oracle licence savings | $100K – $215K | $215K – $430K | $430K – $1M+ |
| Payback period | < 3 months | < 4 months | 3-6 months |
MAP funding covers 70-80% of partner costs. A dedicated Oracle MAP track offers additional credits beyond the standard programme. Details below.
This guide is written for mid-market companies, enterprise IT, and public sector bodies across Europe and the US – organisations running multiple Oracle instances with complex PL/SQL logic that need to migrate without business disruption. We’ve delivered these projects for financial services firms in the City and Frankfurt, healthcare providers bound by NHS Digital standards, and Mittelstand manufacturers modernising legacy ERP backends.
If you need a broader AWS migration overview (not database-specific), see our complete AWS cloud migration guide.
Why organisations leave Oracle for PostgreSQL
Oracle licensing costs – the real scale
| Component | Annual cost (typical enterprise deployment) |
|---|---|
| Oracle Database Enterprise Edition | $47,500/processor |
| Annual Support (22% of licence fee) | $10,450/processor |
| Real Application Clusters (RAC) | $23,000/processor |
| Partitioning Option | $11,500/processor |
| Advanced Security | $15,000/processor |
| Typical 2-socket server (2×8 cores = 16 cores × 0.5 factor) | $107,450 – $214,900/year |
For a mid-size deployment running two such servers, you’re looking at north of $400K per year in licensing alone – before hardware, DBAs, or data centre costs. Aurora PostgreSQL db.r6g.2xlarge (8 vCPU, 64 GB RAM, Multi-AZ) delivers comparable performance at ~$1,400/month = $16,800/year. No user limits. No audit exposure.
Oracle LMS audits – the single biggest trigger for migration decisions
Oracle License Management Services (LMS) audits are ruthless and increasingly common – particularly targeting organisations that have:
- Virtualised their environment (VMware) without purchasing full-rack licensing
- Run Oracle Standard Edition on servers with >2 sockets
- Deployed RAC or Data Guard without the corresponding option licence
The typical outcome? A compliance demand of $500K–$2M+ in back-payments. We’ve seen UK financial services firms hit with seven-figure demands after VMware sprawl went unchecked. German Mittelstand companies face similar exposure, often triggered by Oracle’s push to audit ahead of contract renewals.
Migrating to PostgreSQL removes Oracle’s audit leverage entirely. No licence to be non-compliant with.
Vendor lock-in and inflexibility
- Oracle licences per-processor – scaling up doubles your costs overnight
- No consumption-based pricing (unlike Aurora PostgreSQL, which bills per-second)
- Oracle on AWS still requires BYOL – you’ve moved to the cloud, but the licensing headache follows you
- No native integration with AWS IAM, CloudWatch, or Secrets Manager without additional configuration layers
PostgreSQL – why the timing is right
PostgreSQL has matured dramatically. Version 16 handles table partitioning, parallel query execution, logical replication, and JSON/JSONB natively – capabilities that used to be Oracle’s moat.
On AWS specifically:
- Aurora PostgreSQL delivers 3-5× standard PostgreSQL throughput with automatic failover and up to 15 read replicas. It’s a managed service – patching, backups, and HA are handled for you.
- Native ecosystem integration – IAM database authentication, automatic secret rotation via Secrets Manager, Performance Insights for query-level observability
- Zero licence cost – you pay for compute and storage, nothing else
For regulated industries (FCA in the UK, BaFin in Germany, or SEC-registered firms in the US), Aurora’s compliance certifications (ISO 27001, SOC 2, PCI DSS, C5 for DACH markets) mean you’re not trading Oracle compliance for a gap elsewhere.
Oracle vs PostgreSQL – key technical differences
Data type mapping
| Oracle | PostgreSQL | Notes |
|---|---|---|
| NUMBER(p,s) | NUMERIC(p,s) / INTEGER / BIGINT | SCT maps automatically |
| VARCHAR2(n) | VARCHAR(n) / TEXT | TEXT in PostgreSQL has no performance penalty |
| DATE | TIMESTAMP | Oracle DATE includes time! PostgreSQL DATE does not |
| CLOB | TEXT | PostgreSQL TEXT has no 4 GB limit |
| BLOB | BYTEA / Large Object | BYTEA up to ~1 GB, Large Object for larger |
| RAW | BYTEA | – |
| LONG | TEXT | Deprecated in Oracle, simple mapping |
| XMLTYPE | XML | Native XML type in PostgreSQL |
| INTERVAL YEAR TO MONTH | INTERVAL | PostgreSQL INTERVAL is more flexible |
| ROWID | ctid (internal) | Don’t rely on ROWID – use a primary key |
PL/SQL vs PL/pgSQL – key syntax differences
| Aspect | Oracle PL/SQL | PostgreSQL PL/pgSQL |
|---|---|---|
| Packages | ✅ Native | ❌ None – use schemas + extensions |
| Exceptions | EXCEPTION WHEN | EXCEPTION WHEN (similar syntax) |
| Cursors | CURSOR, REF CURSOR, SYS_REFCURSOR | CURSOR, REFCURSOR |
| Sequences | sequence.NEXTVAL | nextval(‘sequence’) |
| CONNECT BY (hierarchies) | ✅ Native | Use WITH RECURSIVE (CTE) |
| DECODE() | ✅ Native | Use CASE WHEN |
| NVL() | ✅ Native | COALESCE() |
| SYSDATE | ✅ | CURRENT_TIMESTAMP / NOW() |
| Autonomous transactions | PRAGMA AUTONOMOUS_TRANSACTION | dblink or pg_background (workaround) |
| Bulk operations | FORALL, BULK COLLECT | UNNEST + array operations |
| Materialized view refresh | ON COMMIT / ON DEMAND | CREATE MATERIALIZED VIEW + pg_cron |
Oracle features without a direct equivalent
| Oracle feature | PostgreSQL alternative | Migration complexity |
|---|---|---|
| Oracle RAC (multi-node clustering) | Aurora Multi-AZ + read replicas | Low (Aurora manages HA) |
| Oracle Data Guard | Aurora Global Database / logical replication | Low |
| Oracle Advanced Compression | pg_lz4, TOAST compression, partitioning | Medium |
| Oracle Flashback | Point-in-time recovery (PITR) + pg_audit | Low |
| Oracle MODEL clause | Window functions + CTEs | Medium (requires rewrite) |
| Oracle Database Links | postgres_fdw / dblink | Low |
| Oracle Advanced Queuing | Amazon SQS/SNS or pg_notify | Medium |
| Oracle Spatial | PostGIS (extension) | Low |
Step-by-step migration – 8-phase process
Step 1: Assessment and conversion report (SCT)
Run AWS Schema Conversion Tool (SCT) against the source Oracle database. SCT generates an Assessment Report showing:
- Percentage of objects that convert automatically (typically 60-85%)
- List of objects requiring manual intervention (red/amber items)
- Estimated effort for manual conversion
Output: A document categorising objects into auto-convert, simple-manual, and complex-manual. This forms the basis for project estimation.
Timeline: 2-5 days (depends on schema size)
Step 2: Choose the target engine – Aurora PostgreSQL vs RDS PostgreSQL
| Criterion | Aurora PostgreSQL | RDS PostgreSQL |
|---|---|---|
| Performance | 3-5× standard PG | Standard |
| Storage | Auto-scaling up to 128 TB | EBS, manual scaling |
| HA | Built-in Multi-AZ (6 copies across 3 AZs) | Multi-AZ optional (+cost) |
| Read replicas | Up to 15 | Up to 15 |
| Cost | ~20% more than RDS | Lower base cost |
| Failover | 10-20 seconds | 60-120 seconds |
| Recommendation | Enterprise, large databases, HA requirements | Smaller databases, dev/staging, cost-sensitive |
For Oracle Enterprise Edition with RAC migrations: Aurora PostgreSQL is the natural choice – it delivers high availability without Oracle RAC complexity.
Step 3: Schema conversion
AWS SCT automatically converts:
- Tables, indexes, constraints, sequences
- Simple views and triggers
- Stored procedures with basic logic
Manual conversion required for:
- PL/SQL packages (PostgreSQL has no package equivalent – split into schemas + functions)
- CONNECT BY hierarchies → WITH RECURSIVE CTE
- Oracle built-in functions (DECODE → CASE, NVL → COALESCE)
- Autonomous transactions
- Advanced bulk processing (FORALL → array operations)
Tip: Don’t convert 1:1. It’s often better to rewrite procedures using native PostgreSQL features (window functions, LATERAL joins, array aggregation) rather than mimicking Oracle patterns.
AI-assisted conversion: LLM-based tools (Amazon Q Developer, GitHub Copilot) can translate 70-90% of SCT’s “red” objects – PL/SQL packages, CONNECT BY hierarchies, complex cursors. Engineers review and refine the output rather than writing from scratch. In our projects, this cuts the manual conversion phase by 40-60%.
Timeline: 1-4 weeks (depends on PL/SQL volume; with AI assistance, closer to the lower end)
Step 4: Data migration – AWS DMS
AWS Database Migration Service supports two modes:
Full load: One-time transfer of all data. Suitable for databases < 100 GB or where longer downtime (hours) is acceptable.
Full load + CDC (Change Data Capture): Initial full load followed by continuous change replication. Minimises downtime to minutes. Requires:
- Oracle LogMiner or Binary Reader on the source
- Supplemental logging enabled on Oracle
- Appropriate privileges (EXECUTE_CATALOG_ROLE)
DMS configuration:
- Replication instance: dms.r5.xlarge (minimum for production migrations)
- Networking: VPN or Direct Connect to Oracle source
- Table mapping: per-schema, with transformations (lowercase in PostgreSQL!)
Timeline: Full load 100 GB = 4-8 hours (depends on network). CDC lag: <5 seconds.
Step 5: Application code migration
Application changes that are almost always required:
- Connection string: Oracle TNS → PostgreSQL libpq format
- Driver: OCI/JDBC Oracle → npgsql/psycopg2/pg-promise
- Case sensitivity: Oracle defaults to uppercase → PostgreSQL defaults to lowercase (unless quoted)
- Sequence syntax:
seq.NEXTVAL→nextval('seq') - DUAL table:
SELECT 1 FROM DUAL→SELECT 1 - Date handling: Oracle DATE includes time → PostgreSQL separates DATE and TIMESTAMP
- Outer join syntax: Oracle
(+)→ ANSILEFT/RIGHT JOIN - ROWNUM: →
LIMIT/OFFSETor window functionROW_NUMBER()
ORM-based applications (Hibernate, Entity Framework, Django): Changes are minimal – the ORM handles dialect differences. Configuration change + regression testing.
Raw SQL applications: Require a review of every query. Tools like orafce (a PostgreSQL extension emulating Oracle functions) can temporarily bridge differences.
Step 6: Testing and validation
Three layers of testing:
1. Data validation:
- Row count comparison (source vs target)
- Checksums on critical tables
- Spot-check of random records
- AWS DMS Data Validation task (automated)
2. Functional testing:
- Run the full application regression test suite against the new database
- Compare query results (Oracle vs PostgreSQL) for critical reports
- Test stored procedures with edge cases
3. Performance testing:
- Compare response times for the top 50 queries
- Load testing with production traffic profile
- Execution plan analysis – PostgreSQL’s optimiser behaves differently from Oracle CBO
AI-assisted validation: Generate test cases for stored procedures (based on schema and business logic), automate Oracle vs PostgreSQL result comparison on sample data, and identify performance regressions. LLMs analyse execution plans and suggest missing indexes. In practice, this shortens the testing phase by 30-40%.
Timeline: 2-4 weeks (don’t cut this short – it’s the most common point of project failure)
Step 7: Cutover – switching production
Near-zero-downtime strategy (DMS CDC):
- DMS replicates changes in real time (CDC lag <5s)
- Stop writes on Oracle (maintenance window)
- Wait for DMS to catch up to zero lag
- Switch application connection string to Aurora/RDS
- Validate – smoke tests
- Open traffic
Typical downtime: 5-30 minutes (time to drain lag + switch + smoke test)
Rollback plan: Keep Oracle in read-only mode for 48-72h after cutover. If a critical issue arises, rollback = switch the connection string back. DMS reverse replication is optional.
Step 8: Stabilisation and optimisation
First 2-4 weeks post-cutover:
- Performance tuning: Adjust
work_mem,shared_buffers,effective_cache_sizeto match workload profile - Index optimisation: PostgreSQL may need different indexes than Oracle (partial indexes, GIN indexes for JSONB)
- Connection pooling: PgBouncer or RDS Proxy (Aurora has a max connections limit depending on instance class)
- Monitoring: Performance Insights, Enhanced Monitoring, CloudWatch alarms on CPU, IOPS, connections
- Oracle decommission: After 30 days of stable operation – shut down Oracle, cancel support contracts
AWS tools for Oracle → PostgreSQL migration
AWS Schema Conversion Tool (SCT)
SCT analyses your Oracle schema and generates equivalent PostgreSQL DDL plus PL/pgSQL procedures. Think of it as the first pass – it handles the straightforward conversions so your engineers can focus on the hard parts.
It generates a colour-coded Assessment Report: green means auto-converted, amber means you’ll need to tweak it, red means someone needs to sit down and think through the logic. In our experience, 60-85% of objects land in green or amber territory.
Where SCT falls short: PL/SQL packages get flattened (you lose encapsulation), CONNECT BY hierarchies need manual CTE rewrites, and some Oracle analytic functions require a human eye. But for the price (free – it’s part of the AWS toolkit), it’s an essential starting point.
AWS Database Migration Service (DMS)
DMS moves the actual data. It supports one-off full loads and, more importantly, continuous replication via Change Data Capture (CDC) – which is how you achieve near-zero downtime on the final cutover.
A few things to get right on the Oracle side: supplemental logging must be enabled, you’ll need Binary Reader or LogMiner access, and the replication instance should be sized at roughly 1 vCPU per 50 GB of data being loaded (or per 100 tables under CDC).
On the PostgreSQL target, set up a logical replication slot for Multi-AZ configurations and flip session_replication_role to replica during the initial load to avoid trigger interference.
Running cost is modest – roughly $0.018/h per vCPU on the replication instance, plus data transfer.
ora2pg – the open-source option
A Perl-based tool that handles schema and data conversion without any AWS dependency. Useful for smaller databases, on-premise PostgreSQL targets, or situations where you want fine-grained control over every conversion decision.
It’s less suitable for large enterprises with hundreds of stored procedures (SCT’s heuristics are better at scale) and it doesn’t support CDC – so you’ll still need DMS or a custom solution for live replication.
How AWS MAP funds your Oracle → PostgreSQL migration
What MAP actually is
The Migration Acceleration Program is AWS’s way of subsidising your move off competing platforms. It’s not a discount on AWS services – it’s funding that covers your migration partner’s fees (assessment, engineering, testing, cutover). Three phases, each with its own funding envelope:
| Phase | What gets funded | Typical coverage |
|---|---|---|
| Assess | Environment audit, business case, migration plan | 50-100% of assessment costs |
| Mobilize | Landing zone build, governance, proof of concept | 50-80% of partner fees |
| Migrate & Modernize | The actual migration work | 70-80% of partner fees |
The Oracle-specific MAP track
AWS runs a dedicated MAP track for Oracle database migrations with a larger budget than the standard programme. This isn’t widely advertised, but it exists because AWS has a strategic interest in moving Oracle workloads onto its platform.
What the Oracle track adds beyond standard MAP:
- Additional credits to cover tooling, extended testing, and team upskilling
- Higher funding ceilings for complex multi-database estates
- “Windows of Opportunity” bonuses when you migrate before your Oracle renewal date (Oracle renewals are leverage points – AWS knows this)
Who qualifies
The bar isn’t as high as you might expect:
- Active Oracle environment (on-premise, co-located, or running on EC2 with BYOL)
- Minimum ~$50K in partner engagement value (this rules out trivial single-instance migrations, but most enterprise scenarios clear it easily)
- Target must be an AWS-native database service (Aurora PostgreSQL or RDS PostgreSQL)
- You need a certified MAP partner to submit the application. We handle this end-to-end.
What this looks like in practice
| Scenario | Project cost | MAP covers | You pay |
|---|---|---|---|
| Single Oracle SE instance, 50 GB, straightforward procedures | €28,000 | ~€19,000 (67%) | ~€9,000 |
| 3× Oracle EE, 500 GB combined, complex PL/SQL | €105,000 | ~€74,000 (71%) | ~€31,000 |
| Enterprise estate: 10+ instances, 2+ TB, RAC clustering | €280,000 | ~€210,000 (75%) | ~€70,000 |
On top of the partner fee coverage, you’ll typically receive 1-3 months of AWS infrastructure credits for the target environment, access to AWS Solution Architects during the project, and (for the largest engagements) direct involvement from AWS Professional Services.
DACH and UK compliance context
For organisations in regulated industries, MAP funding doesn’t change your compliance obligations – but Aurora PostgreSQL’s certification stack makes it easier to meet them:
- UK (FCA-regulated): Aurora supports data residency in eu-west-2 (London). ISO 27001, SOC 2 Type II, and PCI DSS compliance certifications via AWS Artifact.
- Germany/Austria/Switzerland (BaFin, FINMA): C5 attestation (BSI Cloud Computing Compliance Controls Catalogue) covers Aurora PostgreSQL. Data stays within eu-central-1 (Frankfurt).
- GDPR/UK GDPR: Standard contractual clauses built into the AWS Data Processing Addendum. No data leaves the EU/UK unless you explicitly configure cross-region replication.
The qualification process
What we need from you to get started:
- Inventory of Oracle databases – instance count, sizes, rough procedure counts
- A business case outline – even back-of-envelope licensing savings vs migration cost
- Your Oracle renewal timeline – this determines urgency and can unlock bonus funding
- A conversation – we submit the MAP application on your behalf and manage the funding lifecycle through to completion
Most common Oracle → PostgreSQL migration challenges
1. Stored procedures with business logic
Problem: Enterprise Oracle databases have hundreds of PL/SQL procedures implementing business logic (calculations, validations, workflows). SCT converts 60-70% automatically; the rest requires manual work.
Solution:
- Prioritise: identify procedures actually called in production (Oracle AWR report)
- Rewrite, don’t translate: PostgreSQL has better window functions, CTEs and array operations – use them instead of mimicking Oracle
- orafce extension: temporary bridge for Oracle-specific functions (NVL2, DECODE, LPAD with Oracle semantics)
- Per-procedure testing: every converted procedure must pass testing with Oracle results as baseline
- AI assistance (Amazon Q, Copilot): LLMs convert PL/SQL → PL/pgSQL with target schema context. Engineers verify and refine rather than writing from scratch. Reduces manual conversion effort by 40-60% and eliminates common syntax errors
2. Post-migration performance
Problem: Queries that ran in 50ms on Oracle can take 5s on PostgreSQL. Different optimiser, different statistics, different indexes.
Solution:
pg_stat_statements– identify the slowest queriesEXPLAIN (ANALYSE, BUFFERS)– compare execution plans- Additional indexes: PostgreSQL benefits from partial indexes, expression indexes, covering indexes
- Tune
random_page_cost(for SSD: 1.1 instead of the default 4.0) - Connection pooling: PgBouncer in transaction mode (Oracle handles thousands of connections natively; PostgreSQL needs a pooler)
3. Oracle-specific features without a direct equivalent
Problem: CONNECT BY, MODEL clause, MERGE with advanced logic, autonomous transactions.
Solution by feature:
| Oracle feature | PostgreSQL solution | Effort |
|---|---|---|
| CONNECT BY | WITH RECURSIVE CTE | Low (pattern is straightforward, but needs testing) |
| MODEL clause | Window functions + LATERAL | Medium (requires understanding business logic) |
| MERGE (upsert) | INSERT … ON CONFLICT | Low |
| Autonomous transaction | dblink to self or pg_background | Medium (architecture change) |
| DBMS_SCHEDULER | pg_cron or AWS EventBridge + Lambda | Low |
| DBMS_OUTPUT | RAISE NOTICE | Low |
| UTL_FILE | aws_s3 extension (Aurora) or COPY | Low |
4. DBA team mindset shift
Problem: Teams accustomed to Oracle (AWR, ASH, Enterprise Manager) need to learn new tooling.
Solution:
- AWS Performance Insights = Oracle ASH (Active Session History) equivalent
- pg_stat_statements = Oracle V$SQL equivalent
- pgBadger = Oracle AWR Report equivalent
- 2-3 day training for the DBA team (covered by MAP budget)
5. External integrations
Problem: Reporting systems (BI), ETL tools (Informatica, SSIS, Talend) and other applications connect directly to Oracle.
Solution:
- Assessment phase identifies ALL connections to Oracle (netstat, AWR, Oracle auditing)
- Cutover plan includes switching every integration
- Parallel run: DMS maintains Oracle in read-only as a safety net for systems that can’t switch immediately
Timeline and costs for Oracle → PostgreSQL migration
By database size and complexity
| Scenario | Database size | PL/SQL procedures | Timeline | Project cost | With MAP |
|---|---|---|---|---|---|
| Simple | < 100 GB | < 50 simple | 4-8 weeks | €23,000 – €46,000 $25,000 – $50,000 |
€7,000 – €14,000 |
| Medium | 100 GB – 1 TB | 50-200, some complex | 8-14 weeks | €58,000 – €116,000 $63,000 – $125,000 |
€17,000 – €35,000 |
| Complex | > 1 TB | 200+, complex business logic | 14-24 weeks | €116,000 – €280,000 $125,000 – $300,000 |
€35,000 – €84,000 |
| Enterprise multi-DB | Multiple instances, 5+ TB total | 500+, RAC, Data Guard | 6-12 months | €230,000 – €700,000 $250,000 – $750,000 |
€70,000 – €210,000 |
Costs above factor in AI-assisted code conversion (Amazon Q Developer, Copilot). Without AI tooling, the manual conversion phase would take 40-60% longer – particularly visible in “Complex” and “Enterprise” scenarios where stored procedure work dominates the budget.
What affects timeline
| Factor | Impact on timeline | Why |
|---|---|---|
| PL/SQL volume | +2-8 weeks per 100 complex procedures | Manual conversion + testing |
| Zero-downtime requirement | +2-3 weeks | CDC setup, failover testing, parallel run |
| External integrations | +1-3 weeks per 5 integrations | Coordination with external teams |
| No regression tests | +3-4 weeks | Must write tests from scratch |
| Multi-region target | +2-4 weeks | Aurora Global Database setup, DR testing |
Post-migration savings – ROI
Typical organisation with 2 Oracle EE instances (2-socket each):
| Line item | Oracle (annual cost) | Aurora PostgreSQL (annual cost) | Saving |
|---|---|---|---|
| Licence + support | $215,000 × 2 = $430,000 | $0 | $430,000 |
| Infrastructure | $48,000 (on-premise servers) | $40,000 (2× db.r6g.2xlarge Multi-AZ, RI) | $8,000 |
| DBA effort | $120,000 (1.5 FTE) | $80,000 (1 FTE – less manual work) | $40,000 |
| Annual total | $598,000 | $120,000 | $478,000/year |
At a migration cost of ~€70,000 after MAP funding – ROI in under 4 months.
Frequently asked questions
How long does an Oracle to PostgreSQL migration take?
From 4-8 weeks for simple databases (< 100 GB, minimal PL/SQL) to 6-12 months for enterprise with multiple instances, complex business logic in stored procedures, and zero-downtime requirements. The most common scenario (medium database, 100 GB – 1 TB) takes 8-14 weeks.
Does AWS SCT convert PL/SQL automatically?
AWS SCT automatically converts 60-85% of schema objects (tables, indexes, simple procedures). Complex PL/SQL constructs (packages, CONNECT BY, autonomous transactions, MODEL clause) require manual conversion. SCT generates an Assessment Report that precisely identifies what needs manual work.
How much does Oracle to PostgreSQL migration cost?
Project costs range from €23,000 to €700,000 depending on database size and PL/SQL complexity. AWS MAP funding covers 70-80% of partner costs, reducing effective cost to €7,000 – €210,000. Annual Oracle licence savings typically run $200,000 – $500,000 – delivering ROI within 3-6 months.
Does migration require downtime?
No. Using AWS DMS with CDC (Change Data Capture), migration happens with minimal downtime of 5-30 minutes – the time needed to drain the final changes and switch the connection string. DMS replicates changes in real time with lag under 5 seconds.
Aurora PostgreSQL or RDS PostgreSQL – which to choose after Oracle migration?
Aurora PostgreSQL for enterprise: 3-5× standard PG performance, automatic failover in 10-20s, storage up to 128 TB, up to 15 read replicas. RDS PostgreSQL for smaller databases and dev/staging environments where lower base cost is the priority. For Oracle Enterprise Edition with RAC migrations, Aurora is the natural equivalent.
What is AWS MAP and how does it help with Oracle migration?
AWS Migration Acceleration Program (MAP) is a funding programme covering 70-80% of migration partner engagement costs. For Oracle migrations, a dedicated track exists with an increased budget. Organisations with active Oracle environments migrating to AWS services (Aurora/RDS PostgreSQL) qualify. A MAP partner (e.g. Devopsity) submits the application and manages the budget on the client’s behalf.
Next steps – free migration assessment
Every Oracle → PostgreSQL migration starts with assessment. We analyse your Oracle estate (schemas, PL/SQL complexity, data volumes, integration points) and come back with:
- SCT conversion report – what converts automatically, what needs engineering time
- Cost and timeline estimate – realistic ranges, including MAP funding projections
- Architecture recommendation – Aurora vs RDS, Multi-AZ, read replicas, pooling strategy
- Cutover plan – how to switch with minimal business disruption
We’ve delivered Oracle exits for regulated firms in London, Frankfurt, and across the Nordics. Whether you’re facing an Oracle renewal in six months or an LMS audit demand letter on your desk, the first step is understanding what you’re working with.
Considering leaving Oracle?
Book a free 30-minute call. We'll assess your migration complexity and check whether your project qualifies for AWS MAP funding (typically 70-80% of costs covered).